Driveway Crossover TGS Plans — Section 138 NSW
Building a new driveway crossing? Your council almost certainly requires a certified Traffic Guidance Scheme (TGS) as part of your Section 138 application before works can begin. Nigel Bolton has 18 years of experience producing exactly these plans — fast, council-compliant, and delivered remotely across all of NSW.
Standard Driveway Crossover Plan — $160
Typical turnaround: 24 hours. Same-day available. 100% remote — no site visit required.
What is a Section 138 Permit and Why Do You Need a TGS?
Under the NSW Roads Act 1993, any work within a public road reserve — including constructing or modifying a driveway crossing, kerb and gutter, or footpath — requires a Section 138 permit from your local council. Most councils will not issue this permit without a certified Traffic Guidance Scheme (TGS) attached to the application. The TGS shows exactly how pedestrians, cyclists, and motorists will be safely managed while your concreter or civil contractor is working in the road reserve. Without it, your builder cannot legally start, and your DA conditions cannot be satisfied.
Who Needs a Driveway Crossover TGS?
- ✔New home builders — required for the driveway crossing as part of your DA conditions
- ✔Owner-builders — council will not sign off without a compliant TGS
- ✔Concreters & civil contractors — need the plan before starting kerb and gutter works
- ✔Developers & subdividers — required for each new lot vehicle access point
- ✔Plumbers & electricians — any works crossing the nature strip or kerb
Serving:
- Builders
- Concreters
- Plumbers
- Owner builders
- Civil contractors
- Councils
- Electricians
How It Works — 3 Simple Steps
Call or message Nigel
Provide the property address and a brief description of the works. Nigel will review the site using Google Earth — street view and aerial — before calling you back.
Plan is designed
Using RapidPlan professional software, Nigel produces a council-compliant TGS tailored to your specific site, road type, and council requirements. No site visit needed.
Plan delivered — typically within 24 hours
You receive a print-ready PDF plan ready to attach to your Section 138 application. Same-day turnaround available for urgent jobs.
NSW Wide Service
- •Driveway Crossover Specialist
- •Section 138 Works
- •Residential & Commercial Crossovers
- •Vehicle Crossings
- •Driveway Crossovers
- •Pedestrian Management
- •Footpath Closures
- •Lane Closures
- •TGS/TCP
- •Council Permits
- •Fast Turnaround
Ready to get your Section 138 TGS plan?
Call Nigel directly or send a message with your property address — he'll review the site before calling you back.